Projects Under Review:
- Whitefield Subdivision- 1348 Sumneytown Pike: Whitefield Homes LLC propose a 9-lot subdivision and residential development located at 1348 Sumneytown Pike. The plan proposes nine single-family residential lots (8 new building lots, 1 existing historic home). Seven of the new lots will be accessed by a cul-de-sac road off Sumneytown Pike and two lots will have frontage and driveways on Evans Road. The plan proposes public water and sewer. The revised plans are currently under review. A conditional use application related to wetlands crossings was also filed in conjunction with this development. The Conditional Use Application/Plan was recommended for approval with conditions to the BOS by the PC on November 18th, 2026. The Conditional Use public hearing is scheduled before the BOS at their regular meeting on December 8th, 2026, at 7pm.
- Spring House Corporate Center Redevelopment-321Norristown Road: BET 309, LLC is seeking to redevelop this property. The property currently contains two office buildings and a barn. The original plan called for demolishing one of the office buildings, retaining Berkadia in the other, and constructing a four-story, multi-family apartment building with an interior parking garage, along with three commercial retail buildings totaling 47,000 square feet. The plan has since been revised. Under the new proposal, the existing vacant office building would be demolished and replaced with a new office building. Berkadia would then move into the new building, allowing the existing Berkadia office building to be demolished. A four-story, multi-family apartment building would then be constructed in its place. The revised plan also includes additional surface parking and an emergency access connection between Spring House Corporate Center and the neighboring Gwynedd Estates. To allow the mixed-use development, the applicant requested that the parcel be rezoned. The rezoning was approved over the summer. The applicant is now moving forward with the conditional use process, to be followed by land development, for their proposed redevelopment. The plan will be on Planning Commission and Board of Supervisors public meeting agendas in the fall. The BOS approved the map amendment at their regular meeting on July 28th, 2026. The Planning Commission recommended the Conditional Use application/plan for approval by the BOS at their meeting on September 16th. A public conditional use hearing is rescheduled for December 8th, 2026.
- Ambler Yards Apartment Building- 300 Brookside Residential LP proposes a residential land development of a tract of land located at the western corner of the intersection of N. Spring Garden Street and West Francis Avenue directly adjacent to the Ambler Yards mixed-use campus. The development includes the construction of a new 3-story apartment building, paved parking lot, and associated stormwater management facilities. The plans were discussed at the Planning Commission meeting on October 21st, 2026. The applicant will make revisions as discussed and come back before the PC at their meeting on December 16th, 2026.
- Gwynedd Point Village Conditional Use Application- N. Bethlehem Pike & Cedar Hill Road (Spring House Nursery Triangle): The developer, Pete Penna, proposes to combine six separate parcels into one larger property totaling approximately 8.7 acres. He plans to build 48 townhouses there, along with other improvements including a realignment of the Cedar Hill Road-Bethlehem Pike intersection, parking areas, open space, curbing, sidewalks, and landscaping. A land development application was submitted on September 25th, 2026. The plans are under review and will be scheduled before the PC at their meeting on December 16th, 2026.
Projects Under Construction:
- Johns Lane Subdivision-776 Johns Lane: Single-Family residential subdivision consisting of 5 new building lots off of an extension of Johns Lane. New homes are under construction
- J&J CEAS LAB Land Development-1400 McKean Road: J&J is constructing a 42,000 square foot addition to Building 15 on the Spring House Campus. The project also includes the addition of a service parking lot, utility pads, a generator, subsurface utilities, and sidewalks/trails. The building will include lab space and mechanical support.
- Gwynedd Estates-301 Norristown Road: ACTs Retirement Community will be constructing a new two-story 39-unit assisted living facility on their campus and campus amenities.
- 1622 Gypsy Hill Road Land Development (Lot #2 of the 1616 School House Lane Subdivision): Tisman Group LLC proposes to develop the lot created through the 1616 School House Lane Subdivision approved in 2024. This property is located at 1622 Gypsy Hill Road and will include one single-family residential dwelling. The applicant proposes to modify the area of disturbance depicted on the original subdivision plan and also proposes to modify the tree replacement waiver by planting additional trees.
- Gwynedd Mercy Academy High School Waiver of Land Development- 1345 Sumneytown Pike-GMAHS requests a waiver of land development for a parking lot expansion project on their campus.
Projects Approved Construction Pending:
- Spring House Estates-728 Norristown Road: ACTs Retirement Community will be constructing two separate building additions, installing additional parking stalls, and reconstructing the entrance/drop-off area. They are also adding amenities to their campus including an improved courtyard area, walkways, site lighting and landscaping, and modifying an existing stormwater basin.
- Cedar Hill Road Subdivision-1512 & 1524 Cedar Hill Road: Tisman Group LLC proposes a 4-lot residential subdivision on Cedar Hill Road. The applicant proposes to consolidate 1512 and 1524 Cedar Hill Road into one lot totaling 7.76 acres and then subdivide the lot into four new single-family residential building lots. The existing homes will be demolished. This application was approved by the BOS at their meeting on April 28th, 2026.
- Spring House Court Land Development-1217 N. Bethlehem Pike: Hallmark Homes-Spring House Court LLC propose a 3-unit townhouse development at a property located at 1217 N. Bethlehem Pike. The proposed plan is to construct a 3-unit building accessed by a shared driveway off of Bethlehem Pike. The application was approved by the BOS at their meeting on July 28th, 2026.
- Foulkeways at Gwynedd- 1120 Meetinghouse Road: Foulkeways is proposing an expansion to the existing fitness center building on their campus. They plan to add a covered concrete walkway and a new entry lobby. In addition, a portion of the existing asphalt trail would be replaced and reoriented to connect with the existing trail. This plan was approved by the BOS on August 25th, 2026.
- 813 Plymouth Road- CD Ventures LLC proposes a 2-Lot Subdivision, creating one new single-family building lot. The applicant had previously obtained variance relief from the Zoning Hearing Board for a flag lot configuration. The flag lot will take access from an existing driveway on Plymouth Road. The application was approved by the BOS at their meeting on October 27th, 2026.
- Lower Gwynedd Township Public Works Building-WLD-Plans for a new public works building and associated facilities were approved by the BOS at their meeting on November 17th, 2026.